Town of South Cle Elum's 2021 Small City Maintenance
2-E-933(005)-1
2-E-933(005)-1
2021 Small City Maintenance
Multiple Locations
FY 2023 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $30,603
County: Kittitas | Legislative District: 13 | Project Length: 0.10 | TIB Engineer: Jonathan Heusman | Last Payment Date: 11/15/2022
Project Information
Lead Agency | SOUTH CLE ELUM |
Funding Year | 2023 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 13 |
Congressional District | 8 |
Federal Route Number | 9999 |
Project Length | 0.10 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Scott Mackenzie |
Contact Email | townhall@southcleelum.org |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 11/15/2022 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2021 | |
Delayed Project Date | 07/01/2024 | |
Predesign Approval | ||
Design Approval | 02/01/2022 | 12/06/2021 |
Bid Auth. Approval | 05/30/2022 | 05/23/2022 |
Construction Approval | 06/25/2022 | 06/29/2022 |
Project Closeout | 11/15/2022 | 11/09/2022 |
Audit Date | 11/15/2022 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 21,609 | 0 |
Other Construction | 0 | 30,603 |
Total Construction | 21,609 | 30,603 |
Funding Increase | 11,692 | |
Funding Surplus | - 2,698 | |
Total TIB Funding | 30,603 | 30,603 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SOUTH CLE ELUM | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The town of South Cle Elum has incurred severe roadway cracking and potholing throughout the town limits. Wide asphalt cracks have caused roadway degradation. The pavement condition indicates sealing and repair action is advisable to maximize service life before degradation requires full roadway resurfacing.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |