Town of South Cle Elum's FY 2021 Seal Coat Project

2-E-933(002)-1

2-E-933(002)-1
FY 2021 Seal Coat Project

Multiple Locations

FY 2021 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $41,853

County: Kittitas   |   Legislative District: 13   |   Project Length: 0.65   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date: 12/31/2020

Project Information

Lead Agency SOUTH CLE ELUM
Funding Year 2021
Program SCPP
Current Phase Audit
Legislative District 13
Congressional District 8
Federal Route Number P191
Project Length 0.65 mi.
ADT 0
Functional Class Collector
Type of Work Resurfacing
Project Contact Scott MacKenzie
Contact Email southce@gmail.com
TIB Engineer Jonathan Heusman
Last Payment Date 12/31/2020

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2019
Delayed Project Date 07/01/2022  
Predesign Approval
Design Approval 02/01/2020 12/09/2019
Bid Auth. Approval 06/01/2020 12/09/2019
Construction Approval 07/01/2020 12/09/2019
Project Closeout 10/31/2020 12/15/2020
Audit Date   12/31/2020
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 1,890 394
Construction Contract 37,745 41,459
Other Construction 0 0
Total Construction 39,635 41,853
     
Funding Increase 2,218  
Total TIB Funding 41,853 41,853

Local Funding Partners

Funding Amount Percent
SOUTH CLE ELUM 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

Dig outs on damaged wheel paths, then chipseal the entire travel surface.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments