City of Roslyn's 2025 Seal Coat

2-E-932(006)-1

2-E-932(006)-1
2025 Seal Coat

Multiple Locations

FY 2026 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $700,000

County: Kittitas   |   Legislative District: 13   |   Project Length: 2.00   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date:

Project Information

Lead Agency ROSLYN
Funding Year 2026
Program SCPP
Current Phase Design
Legislative District 13
Congressional District 8
Federal Route Number 9999
Project Length 2.00 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Bryson Simplot
Contact Email publicworks@ci.roslyn.wa.us
TIB Engineer Jonathan Heusman
Last Payment Date

Project Schedule

  Target Date Actual Date
Project Selection Date   01/24/2025
Delayed Project Date 07/01/2027  
Predesign Approval
Design Approval 02/28/2025 02/24/2025
Bid Auth. Approval 05/31/2025
Construction Approval 06/30/2025
Project Closeout 12/31/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 53,000 55,789
Right of Way 0 0
Total Design 53,000 55,789
     
Construction Engineering 53,000 55,790
Construction Contract 594,000 625,263
Other Construction 0 0
Total Construction 647,000 681,053
     
Total TIB Funding 700,000 736,842

Local Funding Partners

Funding Amount Percent
ROSLYN 36,842 5.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 36,842 5.0%

Project Description

Seal coat treatment and pulverize followed by double seal coat as needed.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.