The existing road is 24 feet wide with intermittent sidewalk and a pavement condition rating of 59.
Projects — TIB Project Information
TIB Project Information
City of Pomeroy's Peola Road Reconstruction
2-E-929(003)-1
2-E-929(003)-1
Peola Road Reconstruction
MP 0.285 to South City Limits
FY 2017 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $40,143
County: Garfield | Legislative District: 9 | Project Length: 0.29 | TIB Engineer: Jonathan Heusman | Last Payment Date: 11/01/2018
Project Information
Lead Agency | POMEROY |
Funding Year | 2017 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | C131 |
Project Length | 0.29 mi. |
ADT | 535 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Kenny Landkammer |
Contact Email | pompubworks@pomeroy-wa.com |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 11/01/2018 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 06/14/2017 | |
Delayed Project Date | 07/01/2019 | |
Predesign Approval | ||
Design Approval | 06/14/2017 | 06/14/2017 |
Bid Auth. Approval | 06/14/2017 | 06/14/2017 |
Construction Approval | 06/14/2017 | 06/14/2017 |
Project Closeout | 08/31/2018 | 10/29/2018 |
Audit Date | 11/01/2018 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 17,234 |
Right of Way | 0 | 0 |
Total Design | 0 | 17,234 |
Construction Engineering | 0 | 31,056 |
Construction Contract | 48,500 | 249,064 |
Other Construction | 0 | 0 |
Total Construction | 48,500 | 280,120 |
Funding Surplus | - 8,357 | |
Total TIB Funding | 40,143 | 297,354 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
POMEROY | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Garfield County | 0 | 0.0% |
FLHAP | 257,211 | 86.5% |
Total Local Funding | 257,211 | 97.1% |
Project Description
This project will do minor shoulder widening, slope flattening, drainage, HMA, BST, eliminate hazards , and bring the roadway up to the current design standards. The project is combined with the county and is a FHWA Direct-Federal Lands Higjhway Access Program.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |