City of Asotin's FY 2019 Rehabilitation Project
2-E-921(002)-1
2-E-921(002)-1
FY 2019 Rehabilitation Project
Multiple Locations
FY 2019 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $139,126
County: Asotin | Legislative District: 9 | Project Length: 0.39 | TIB Engineer: Jonathan Heusman | Last Payment Date: 11/01/2021
Project Information
Lead Agency | ASOTIN |
Funding Year | 2019 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.39 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Bob Portlock |
Contact Email | asotinpublicworks@cableone.net |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 11/01/2021 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/17/2017 | |
Delayed Project Date | 07/01/2020 | |
Predesign Approval | ||
Design Approval | 01/01/2018 | 12/20/2017 |
Bid Auth. Approval | 05/01/2018 | 07/16/2018 |
Construction Approval | 07/31/2018 | 08/08/2018 |
Project Closeout | 09/30/2021 | 10/28/2021 |
Audit Date | 11/01/2021 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 20,790 | 20,790 |
Right of Way | 0 | 0 |
Total Design | 20,790 | 20,790 |
Construction Engineering | 10,395 | 21,031 |
Construction Contract | 137,734 | 97,305 |
Other Construction | 0 | 0 |
Total Construction | 148,129 | 118,336 |
Funding Increase | 1,634 | |
Funding Surplus | - 31,427 | |
Total TIB Funding | 139,126 | 139,126 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
ASOTIN | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
4th Street from Harding Street to Wilson Street is currently in poor condition (PCR Rating of 24). A full depth reclamation will renew the roadway while saving the costs from a total reconstruction. The roadway does not have sidewalks or curbing, and the only utilities requiring adjustment are storm sewer pipelines and catch basins, making it an ideal candidate for this process.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |