Town of LaCrosse's FY 2021 Seal Coat Project
2-E-912(005)-1
2-E-912(005)-1
FY 2021 Seal Coat Project
Multiple Locations
FY 2021 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $84,427
County: Whitman | Legislative District: 9 | Project Length: 0.57 | TIB Engineer: Jonathan Heusman | Last Payment Date: 10/22/2021
Project Information
Lead Agency | LACROSSE |
Funding Year | 2021 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.57 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Randy Camp |
Contact Email | lacrosse@pionnet.com |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 10/22/2021 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2019 | |
Delayed Project Date | 07/01/2022 | |
Predesign Approval | ||
Design Approval | 02/01/2020 | 12/17/2019 |
Bid Auth. Approval | 04/01/2020 | 12/17/2019 |
Construction Approval | 05/01/2021 | 04/21/2021 |
Project Closeout | 11/30/2021 | 12/10/2021 |
Audit Date | 12/10/2021 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 13,300 | 5,947 |
Right of Way | 0 | 0 |
Total Design | 13,300 | 5,947 |
Construction Engineering | 7,600 | 6,713 |
Construction Contract | 133,575 | 46,870 |
Other Construction | 0 | 24,897 |
Total Construction | 141,175 | 78,480 |
Funding Surplus | - 70,048 | |
Total TIB Funding | 84,427 | 84,427 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
LACROSSE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Minor pavement repair, fix puddling in front of bank, and crack seal in 2020. Whitman County chip seal of the 13-foot, travel lanes in 2020 followed by a fog seal and striping.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |