The following streets are showing signs of deterioration. The streets and current pavement condition rating (PCR) are 2nd Street - Union to Douglas59 Douglas Street - 2nd to 1st63 1st Street - Douglas to Parker59
Projects — TIB Project Information
TIB Project Information
Town of Garfield's FY 2018 Seal Coat Project
2-E-911(007)-1
2-E-911(007)-1
FY 2018 Seal Coat Project
Multiple Locations
FY 2018 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $92,686
County: Whitman | Legislative District: 9 | Project Length: 0.42 | TIB Engineer: Jonathan Heusman | Last Payment Date: 11/13/2017
Project Information
Lead Agency | GARFIELD |
Funding Year | 2018 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.42 mi. |
ADT | 200 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Candi Fisher |
Contact Email | garfield-town@garfield-wa.com |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 11/13/2017 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/18/2016 | |
Delayed Project Date | 07/01/2019 | |
Predesign Approval | ||
Design Approval | 01/01/2017 | 12/28/2016 |
Bid Auth. Approval | 04/01/2017 | 12/28/2016 |
Construction Approval | 05/01/2017 | 08/14/2017 |
Project Closeout | 10/31/2017 | 10/31/2017 |
Audit Date | 11/13/2017 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 64,336 | 92,686 |
Other Construction | 0 | 0 |
Total Construction | 64,336 | 92,686 |
Funding Increase | 28,350 | |
Total TIB Funding | 92,686 | 92,686 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
GARFIELD | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project seal cracks, repairs pavement and chip seals the following streets 2nd Street - Union to Douglas Douglas Street - 2nd to 1st 1st Street - Douglas to Parker Whitman County agreed to provide the chip seal as part of their county chip seal program. Added scope, costs & funds from TIB #2-E-911(008)-1 Emergency Pavement Repair Project to this project on 14 Aug 2017. The scope repairs Jefferson Street from 3rd to 4th and Union Street between 7th and 8th.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |