The following streets are showing signs of deterioration. The pavement condition ratings for each street are 50 Main Street - C to 1st 77 1st Street - Railroad to Main 59 Washington Street - Garfield-Farmington Rd to 5th
Projects — TIB Project Information
TIB Project Information
Town of Farmington's FY 2018 Seal Coat Project
2-E-910(001)-1
2-E-910(001)-1
FY 2018 Seal Coat Project
Multiple Locations
FY 2018 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $62,442
County: Whitman | Legislative District: 9 | Project Length: 0.84 | TIB Engineer: Jonathan Heusman | Last Payment Date: 11/11/2017
Project Information
Lead Agency | FARMINGTON |
Funding Year | 2018 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.84 mi. |
ADT | 200 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Barb Dial-Flomer |
Contact Email | townoffarmington.wa@gmail.com |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 11/11/2017 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/18/2016 | |
Delayed Project Date | 07/01/2019 | |
Predesign Approval | ||
Design Approval | 01/01/2017 | 12/01/1916 |
Bid Auth. Approval | 04/01/2017 | 12/19/2016 |
Construction Approval | 05/01/2017 | 12/19/2016 |
Project Closeout | 10/31/2017 | 11/15/2017 |
Audit Date | 12/01/2017 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 86,776 | 62,442 |
Other Construction | 0 | 0 |
Total Construction | 86,776 | 62,442 |
Funding Surplus | - 24,334 | |
Total TIB Funding | 62,442 | 62,442 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
FARMINGTON | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project seal cracks, repairs pavement and chip seal on the following streets 1st Street - Railroad to Main Washington Street - Garfield-Farmington Rd to 5th 2nd Street - Washington to Main Whitman County agreed to provide the chip seal as part of their county chip seal program.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |