Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

Town of Albion's 2024 Street Maintenance

2-E-907(005)-1

2-E-907(005)-1
2024 Street Maintenance

Multiple Locations

FY 2025 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0

County: Whitman   |   Legislative District: 9   |   Project Length: 0.00   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date:

Project Information

Lead Agency ALBION
Funding Year 2025
Program SCPP
Current Phase Withdrawn
Legislative District 9
Congressional District 5
Federal Route Number 9999
Project Length 0.00 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Starr Cathey
Contact Email townofalbion@palouse.com
TIB Engineer Jonathan Heusman
Last Payment Date

Project Schedule

  Target Date Actual Date
Project Selection Date   12/01/2023
Delayed Project Date 07/01/2026  
Predesign Approval
Design Approval 02/01/2024 12/18/2023
Bid Auth. Approval 05/01/2024
Construction Approval 05/15/2024
Project Closeout 10/31/2024
Audit Date  
Withdrawn Date   02/07/2024

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 0 0
Other Construction 0 0
Total Construction 0 0
     
Total TIB Funding 0 0

Local Funding Partners

Funding Amount Percent
ALBION 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

The proposed solution would be crack sealing until we qualify for chip sealing.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments