FY 2025 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0
County: Whitman | Legislative District: 9 | Project Length: 0.00 | TIB Engineer: Jonathan Heusman | Last Payment Date:
Project Information
Lead Agency | ALBION |
Funding Year | 2025 |
Program | SCPP |
Current Phase | Withdrawn |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Starr Cathey |
Contact Email | townofalbion@palouse.com |
TIB Engineer | Jonathan Heusman |
Last Payment Date |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
Predesign Approval | ||
Design Approval | 02/01/2024 | 12/18/2023 |
Bid Auth. Approval | 05/01/2024 | |
Construction Approval | 05/15/2024 | |
Project Closeout | 10/31/2024 | |
Audit Date | ||
Withdrawn Date | 02/07/2024 |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 0 | 0 |
Other Construction | 0 | 0 |
Total Construction | 0 | 0 |
Total TIB Funding | 0 | 0 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
ALBION | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The proposed solution would be crack sealing until we qualify for chip sealing.
Existing Condition
Project Benefits
- Intent is to have County perform the work.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |