Many roads have sections with spalled pavement or severe rutting that need repair. Alligatored areas exist in some areas along all of the segments.
Projects — TIB Project Information
TIB Project Information
City of Chewelah's 2025 Street Maintenance
2-E-901(007)-1
2-E-901(007)-1
2025 Street Maintenance
Multiple Locations
FY 2026 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $64,025
County: Stevens | Legislative District: 7 | Project Length: 0.00 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
Lead Agency | CHEWELAH |
Funding Year | 2026 |
Program | SCPP |
Current Phase | Design |
Legislative District | 7 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Jim Caruso |
Contact Email | cadmin@cityofchewelah.org |
TIB Engineer | Andrew Beagle |
Last Payment Date |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
Predesign Approval | ||
Design Approval | 02/01/2025 | 01/29/2025 |
Bid Auth. Approval | 03/01/2025 | |
Construction Approval | 04/01/2025 | |
Project Closeout | 06/16/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 64,025 | 67,395 |
Other Construction | 0 | 0 |
Total Construction | 64,025 | 67,395 |
Total TIB Funding | 64,025 | 67,395 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
CHEWELAH | 3,370 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 3,370 | 5.0% |
Project Description
Pavement repair, skimcoats, and crack seal by city forces.
Existing Condition
Project Benefits
- Before the county can start chip sealing, all roads will need some maintenance to provide a sealed and smooth roadway.
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |