Many streets in Spangle are extremely deteriorated. Large areas of alligator cracking are present. The streets approved for funding and their current pavement condition ratings (PCR) are 1st Street - Pine to EC/L32 2nd Street - Pine to Spangle36 4th Street - Ash to Spangle32 5th Street - Ash to Spangle44 Spangle Avenue - 3rd to 5th44
Projects — TIB Project Information
TIB Project Information
City of Spangle's FY 2018 Rehabilitation Project
2-E-899(002)-1
2-E-899(002)-1
FY 2018 Rehabilitation Project
Multiple Locations
FY 2018 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $356,093
County: Spokane | Legislative District: 9 | Project Length: 0.55 | TIB Engineer: Andrew Beagle | Last Payment Date: 08/01/2018
Project Information
Lead Agency | SPANGLE |
Funding Year | 2018 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.55 mi. |
ADT | 250 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Peggy Mangis |
Contact Email | townofspangle@centurytel.net |
TIB Engineer | Andrew Beagle |
Last Payment Date | 08/01/2018 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/18/2016 | |
Delayed Project Date | 07/01/2019 | |
Predesign Approval | ||
Design Approval | 01/01/2017 | 03/08/2017 |
Bid Auth. Approval | 01/15/2018 | 01/25/2018 |
Construction Approval | 02/15/2018 | 02/26/2018 |
Project Closeout | 12/31/2018 | 07/18/2018 |
Audit Date | 08/01/2018 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 34,460 | 34,460 |
Right of Way | 0 | 0 |
Total Design | 34,460 | 34,460 |
Construction Engineering | 34,460 | 34,460 |
Construction Contract | 229,755 | 287,173 |
Other Construction | 0 | 0 |
Total Construction | 264,215 | 321,633 |
Funding Increase | 57,418 | |
Total TIB Funding | 356,093 | 356,093 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SPANGLE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project uses full depth reclamation with cement to rehabilitate the base and cap the surface with a two-in hot mix asphalt overlay on the following sections 1st Street - Pine to EC/L 2nd Street - Pine to Spangle 4th Street - Ash to Spangle 5th Street - Ash to Spangle Spangle Avenue - 3rd to 5th
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |