The existing road surface is cracked and worn. Some areas of rutting exist near Pine Street.
Projects — TIB Project Information
TIB Project Information
City of Spangle's FY 2013 Overlay Project
2-E-899(001)-1
2-E-899(001)-1
FY 2013 Overlay Project
Multiple Locations
FY 2013 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $124,922
County: Spokane | Legislative District: 9 | Project Length: 0.25 | TIB Engineer: Andrew Beagle | Last Payment Date: 01/07/2013
Project Information
Lead Agency | SPANGLE |
Funding Year | 2013 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.25 mi. |
ADT | 125 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Peggy Mangis |
Contact Email | townofspangle@centurytel.net |
TIB Engineer | Andrew Beagle |
Last Payment Date | 01/07/2013 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/18/2011 | |
Delayed Project Date | 07/01/2014 | |
Predesign Approval | ||
Design Approval | 01/01/2012 | 02/03/2012 |
Bid Auth. Approval | 05/01/2012 | 02/03/2012 |
Construction Approval | 06/01/2012 | 09/11/2012 |
Project Closeout | 10/31/2012 | 01/03/2013 |
Audit Date | 01/07/2013 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 9,882 | 9,335 |
Right of Way | 0 | 0 |
Total Design | 9,882 | 9,335 |
Construction Engineering | 0 | 9,500 |
Construction Contract | 88,937 | 106,087 |
Other Construction | 0 | 0 |
Total Construction | 88,937 | 115,587 |
Funding Increase | 26,103 | |
Total TIB Funding | 124,922 | 124,922 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SPANGLE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project repairs alligatored areas, seals cracks and places an overlay E First and E Second Streets.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |