The pavement condition ratings of the segments are as follows Carlton - SR 27 to 2nd 63 Carlton - 2nd to 3rd 63 Main - McNeil to Fairweather 68 Fairweather - McNeil to Ticknor 63 Ticknor - Fairweather to McNeil 63 McNeil - Main to Ticknor 63
Projects — TIB Project Information
TIB Project Information
Town of Fairfield's FY 2019 Seal Coat Project
2-E-895(003)-1
2-E-895(003)-1
FY 2019 Seal Coat Project
Multiple Locations
FY 2019 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $86,708
County: Spokane | Legislative District: 9 | Project Length: 0.46 | TIB Engineer: Andrew Beagle | Last Payment Date: 02/16/2021
Project Information
Lead Agency | FAIRFIELD |
Funding Year | 2019 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.46 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Cheryl Loeffler |
Contact Email | townclerk@fairfieldwa.com |
TIB Engineer | Andrew Beagle |
Last Payment Date | 02/16/2021 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/17/2017 | |
Delayed Project Date | 07/01/2020 | |
Predesign Approval | ||
Design Approval | 01/01/2018 | 07/25/2018 |
Bid Auth. Approval | 04/01/2018 | 05/04/2020 |
Construction Approval | 06/01/2020 | 05/04/2020 |
Project Closeout | 05/31/2021 | 02/11/2021 |
Audit Date | 02/16/2021 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 4,641 | 4,641 |
Right of Way | 0 | 0 |
Total Design | 4,641 | 4,641 |
Construction Engineering | 0 | 0 |
Construction Contract | 81,896 | 82,067 |
Other Construction | 0 | 0 |
Total Construction | 81,896 | 82,067 |
Funding Increase | 171 | |
Funding Surplus | - 0 | |
Total TIB Funding | 86,708 | 86,708 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
FAIRFIELD | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project repairs pavement, seals cracks, prelevels where needed and chip seals.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |