Truck traffic on several streets increased since completion of the Main Street project. The streets do not have adequate structure for the loading. Alligator cracking is apparent along Brewster, Johnson and McNeil Streets.
Projects — TIB Project Information
TIB Project Information
Town of Fairfield's FY 2017 Overlay Project
2-E-895(002)-1
2-E-895(002)-1
FY 2017 Overlay Project
Multiple Locations
FY 2017 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $181,731
County: Spokane | Legislative District: 9 | Project Length: 0.31 | TIB Engineer: Andrew Beagle | Last Payment Date: 01/17/2017
Project Information
Lead Agency | FAIRFIELD |
Funding Year | 2017 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.31 mi. |
ADT | 150 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Cheryl Loeffler |
Contact Email | fairfieldwa@outlook.com |
TIB Engineer | Andrew Beagle |
Last Payment Date | 01/17/2017 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/20/2015 | |
Delayed Project Date | 07/01/2018 | |
Predesign Approval | ||
Design Approval | 01/15/2016 | 12/08/2015 |
Bid Auth. Approval | 04/01/2016 | 07/01/2016 |
Construction Approval | 08/01/2016 | 08/01/2016 |
Project Closeout | 12/31/2016 | 12/28/2016 |
Audit Date | 01/17/2017 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 12,154 | 12,274 |
Right of Way | 0 | 0 |
Total Design | 12,154 | 12,274 |
Construction Engineering | 12,154 | 12,145 |
Construction Contract | 121,523 | 157,312 |
Other Construction | 0 | 0 |
Total Construction | 133,677 | 169,457 |
Funding Increase | 35,900 | |
Total TIB Funding | 181,731 | 181,731 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
FAIRFIELD | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
This project pulverizes the surface, adds crushed surfacing and overlays the streets to provide additional structure. Four ADA ramp upgrades and minor sidewalk repair are included in the scope. The project includes work on the following streets - Brewster Street - Railroad to McNeil - Johnson Avenue - Brewster to Main - McNeil Avenue - Governor Moore to Main
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |