Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

Town of Metaline's 2022 Seal Coat Project

2-E-890(003)-1

2-E-890(003)-1
2022 Seal Coat Project

Multiple Locations

FY 2022 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0

County: Pend Oreille   |   Legislative District: 7   |   Project Length: 0.63   |   TIB Engineer: Andrew Beagle   |   Last Payment Date:

Project Information

Lead Agency METALINE
Funding Year 2022
Program SCPP
Current Phase Withdrawn
Legislative District 7
Congressional District 5
Federal Route Number 9999
Project Length 0.63 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Pete Daggett
Contact Email townofmetaline@ifiber.tv
TIB Engineer Andrew Beagle
Last Payment Date

Project Schedule

  Target Date Actual Date
Project Selection Date   08/04/2021
Delayed Project Date 07/01/2024  
Predesign Approval 08/04/2021
Design Approval 09/30/2021 08/17/2021
Bid Auth. Approval 09/30/2021 08/17/2021
Construction Approval 09/30/2021 08/17/2021
Project Closeout 07/31/2022
Audit Date  
Withdrawn Date   12/20/2022

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 0 0
Other Construction 0 0
Total Construction 0 0
     
Total TIB Funding 0 0

Local Funding Partners

Funding Amount Percent
METALINE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

Pend Oreille County will be chip sealing in this area in the Summer of 2022 and agreed to chip seal Boundary Rd from International Selkirk Loop to the North City Limits and Oriole Rd from Boundary Rd to Cemetary Rd.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments