Town of Ione's FY 2013 Sidewalk Maintenance Project

2-E-889(004)-1

2-E-889(004)-1
FY 2013 Sidewalk Maintenance Project

Multiple Locations

FY 2013 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $53,192

County: Pend Oreille   |   Legislative District: 7   |   Project Length: 0.15   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 09/14/2012

Project Information

Lead Agency IONE
Funding Year 2013
Program SCPP
Current Phase Audit
Legislative District 7
Congressional District 5
Federal Route Number 9999
Project Length 0.15 mi.
ADT 150
Functional Class TIB Arterial
Type of Work Pedestrian
Project Contact Sandy Hutchinson
Contact Email townclerk@potc.net
TIB Engineer Andrew Beagle
Last Payment Date 09/14/2012

Project Schedule

  Target Date Actual Date
Project Selection Date   11/18/2011
Delayed Project Date 07/01/2014  
Predesign Approval
Design Approval 01/01/2012 01/24/2012
Bid Auth. Approval 05/01/2012 01/24/2012
Construction Approval 05/16/2012 06/06/2012
Project Closeout 10/31/2012 08/29/2012
Audit Date   09/14/2012
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 6,450 4,612
Right of Way 0 0
Total Design 6,450 4,612
     
Construction Engineering 4,900 4,900
Construction Contract 38,150 43,680
Other Construction 0 0
Total Construction 43,050 48,580
     
Funding Increase 3,692  
Total TIB Funding 53,192 53,192

Local Funding Partners

Funding Amount Percent
IONE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

The project reconstructs sidewalk on the north side of Main Street one half block west to SR 31 and on the south side from SR 31 to 1st Street. Sidewalk ramps will be updated to meet ADA requirements. The scope was reduced at Bid Award to fit the approved funds.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.