Projects — TIB Project Information
TIB Project Information
Town of Ione's FY 2012 Sidewalk Maintenance Project
2-E-889(003)-1
2-E-889(003)-1
FY 2012 Sidewalk Maintenance Project
Multiple Locations
FY 2012 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $139,363
County: Pend Oreille | Legislative District: 7 | Project Length: 0.30 | TIB Engineer: Andrew Beagle | Last Payment Date: 11/02/2011
Project Information
Lead Agency | IONE |
Funding Year | 2012 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 7 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.30 mi. |
ADT | 150 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Sandy Hutchinson |
Contact Email | townclerk@potc.net |
TIB Engineer | Andrew Beagle |
Last Payment Date | 11/02/2011 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2010 | |
Delayed Project Date | 07/01/2013 | |
Predesign Approval | ||
Design Approval | 12/15/2010 | 01/21/2011 |
Bid Auth. Approval | 06/01/2012 | 01/21/2011 |
Construction Approval | 05/15/2011 | 06/21/2011 |
Project Closeout | 12/31/2011 | 10/26/2011 |
Audit Date | 11/02/2011 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 7,920 |
Right of Way | 0 | 0 |
Total Design | 0 | 7,920 |
Construction Engineering | 0 | 3,451 |
Construction Contract | 117,159 | 127,992 |
Other Construction | 0 | 0 |
Total Construction | 117,159 | 131,443 |
Funding Increase | 25,341 | |
Funding Surplus | - 3,137 | |
Total TIB Funding | 139,363 | 139,363 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
IONE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
This project will repair damaged segments of sidewalk along the 3rd Street in mid-block alley and 4th Street between Main St and Houghton and along the Main Street between Railroad Street and SR 31.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |