The road surface is worn with potholes in areas. The town recently completed water system work along the route. Patching runs the entire length of the project.
Projects — TIB Project Information
TIB Project Information
Town of Ione's Eighth Avenue Overlay
2-E-889(001)-1
2-E-889(001)-1
Eighth Avenue Overlay
Bud Porter Rd to Grinnell St
FY 2008 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $142,603
County: Pend Oreille | Legislative District: 7 | Project Length: 0.77 | TIB Engineer: Andrew Beagle | Last Payment Date: 01/15/2009
Project Information
Lead Agency | IONE |
Funding Year | 2008 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 7 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.77 mi. |
ADT | 250 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Mayor Ed Stambaugh |
Contact Email | mkoontz@iomet.com |
TIB Engineer | Andrew Beagle |
Last Payment Date | 01/15/2009 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 10/15/2007 | |
Delayed Project Date | 07/01/2010 | |
Predesign Approval | ||
Design Approval | ||
Bid Auth. Approval | 05/23/2008 | |
Construction Approval | 06/15/2008 | 07/02/2008 |
Project Closeout | 12/31/2008 | 01/15/2009 |
Audit Date | 01/15/2009 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 107,730 | 139,375 |
Other Construction | 0 | 3,228 |
Total Construction | 107,730 | 142,603 |
Funding Increase | 37,150 | |
Funding Surplus | - 2,277 | |
Total TIB Funding | 142,603 | 142,603 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
IONE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Provide a 2-in HMA overlay on existing road surface. Because the road is inadequate for the truck volumes, a Crushed Surfacing Top Course will be added over native soil. No sidewalk exists on the route.
Existing Condition
Project Benefits
- Extend road life;
- Strengthen section
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |