Marble and Burton Streets are located adjacent to SR 20 in the south end of town. The streets are deteriorated with cracking and patching. The current pavement condition ratings are Burton - 44
Projects — TIB Project Information
TIB Project Information
Town of Twisp's FY 2017 Overlay Project
2-E-886(004)-1
2-E-886(004)-1
FY 2017 Overlay Project
Multiple Locations
FY 2017 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $180,448
County: Okanogan | Legislative District: 12 | Project Length: 0.37 | TIB Engineer: Andrew Beagle | Last Payment Date: 02/01/2017
Project Information
Lead Agency | TWISP |
Funding Year | 2017 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.37 mi. |
ADT | 200 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Andrew Denham |
Contact Email | publicworks@townoftwisp.com |
TIB Engineer | Andrew Beagle |
Last Payment Date | 02/01/2017 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/20/2015 | |
Delayed Project Date | 07/01/2018 | |
Predesign Approval | ||
Design Approval | 01/15/2016 | 12/22/2015 |
Bid Auth. Approval | 05/01/2016 | 06/30/2016 |
Construction Approval | 07/20/2016 | 08/01/2016 |
Project Closeout | 03/01/2017 | 01/25/2017 |
Audit Date | 02/01/2017 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 10,768 | 12,520 |
Right of Way | 0 | 0 |
Total Design | 10,768 | 12,520 |
Construction Engineering | 10,768 | 15,000 |
Construction Contract | 113,065 | 152,928 |
Other Construction | 0 | 0 |
Total Construction | 123,833 | 167,928 |
Funding Increase | 50,219 | |
Funding Surplus | - 4,372 | |
Total TIB Funding | 180,448 | 180,448 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
TWISP | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
REVISED SCOPE This project repairs pavement, adds crown with pre-level and overlays the surface on Burton and Riverside Avenue from SR 20 to the bus turnout. ORIGINAL SCOPE This project grinds and overlays the existing surfaces on the following streets Marble S End to SR 20 Burton Riverside to SR 20
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |