Industrial Way provides access to numerous industrial and agricultural businesses. The road has insufficient base for the loading. The existing surface is alligatored and pot holed with rutting in areas.
Projects — TIB Project Information
TIB Project Information
City of Pateros's FY 2019 Rehabilitation Project
2-E-883(005)-1
2-E-883(005)-1
FY 2019 Rehabilitation Project
Multiple Locations
FY 2019 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $357,273
County: Okanogan | Legislative District: 12 | Project Length: 0.47 | TIB Engineer: Andrew Beagle | Last Payment Date: 02/03/2020
Project Information
Lead Agency | PATEROS |
Funding Year | 2019 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.47 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Jord Wilson |
Contact Email | paterosparks@outlook.com |
TIB Engineer | Andrew Beagle |
Last Payment Date | 02/03/2020 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/17/2017 | |
Delayed Project Date | 07/01/2020 | |
Predesign Approval | ||
Design Approval | 01/01/2018 | 01/23/2018 |
Bid Auth. Approval | 02/01/2019 | 01/28/2019 |
Construction Approval | 02/15/2019 | 03/11/2019 |
Project Closeout | 12/31/2019 | 01/27/2020 |
Audit Date | 02/03/2020 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 37,607 | 39,311 |
Right of Way | 0 | 0 |
Total Design | 37,607 | 39,311 |
Construction Engineering | 37,606 | 25,209 |
Construction Contract | 361,021 | 292,754 |
Other Construction | 0 | 0 |
Total Construction | 398,627 | 317,962 |
Funding Surplus | - 78,961 | |
Total TIB Funding | 357,273 | 357,273 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
PATEROS | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project provides full depth reclamation and overlay to establish sufficient base for the truck loading.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |