The following section is in need of pavement maintenance to stop deterioration of the surface Pine Street - 1st Ave to 3rd Ave The current pavement condition rating (PCR) is 50.
Projects — TIB Project Information
TIB Project Information
City of Okanogan's FY 2014 Overlay Project
2-E-881(004)-1
2-E-881(004)-1
FY 2014 Overlay Project
Multiple Locations
FY 2014 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $102,244
County: Okanogan | Legislative District: 7 | Project Length: 0.10 | TIB Engineer: Andrew Beagle | Last Payment Date: 02/17/2015
Project Information
Lead Agency | OKANOGAN |
Funding Year | 2014 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 7 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.10 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Shawn Davisson |
Contact Email | okanogandpw@ncidata.com |
TIB Engineer | Andrew Beagle |
Last Payment Date | 02/17/2015 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/16/2012 | |
Delayed Project Date | 07/01/2015 | |
Predesign Approval | ||
Design Approval | 01/01/2013 | 01/16/2013 |
Bid Auth. Approval | 06/01/2014 | 01/16/2013 |
Construction Approval | 07/01/2014 | 02/18/2014 |
Project Closeout | 02/01/2015 | 02/11/2015 |
Audit Date | 02/17/2015 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 7,920 | 8,694 |
Right of Way | 0 | 0 |
Total Design | 7,920 | 8,694 |
Construction Engineering | 11,880 | 7,900 |
Construction Contract | 79,200 | 78,604 |
Other Construction | 0 | 7,046 |
Total Construction | 91,080 | 93,550 |
Funding Increase | 20,759 | |
Funding Surplus | - 17,515 | |
Total TIB Funding | 102,244 | 102,244 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
OKANOGAN | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project grinds the existing surface, pre-levels and provides a two-inch overlay on Pine Street from 1st Ave to 3rd Ave. Minor pavement repair and ADA ramp upgrades are included in the scope.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |