TIB Project Information

Town of Nespelem's 2009 WSDOT Chip Seal

2-E-880(002)-1

2-E-880(002)-1
2009 WSDOT Chip Seal

Town of Nespelem

FY 2010 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $65,043

County: Okanogan   |   Legislative District: 12   |   Project Length: 1.58   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 10/20/2009

Project Information

Lead Agency NESPELEM
Funding Year 2010
Program SCPP
Current Phase Audit
Legislative District 12
Congressional District 4
Federal Route Number 9999
Project Length 1.58 mi.
ADT 100
Functional Class Collector
Type of Work Resurfacing
Project Contact Paul Mahre
Contact Email mahrep@wsdot.wa.gov
TIB Engineer Andrew Beagle
Last Payment Date 10/20/2009

Project Schedule

  Target Date Actual Date
Project Selection Date   10/24/2008
Delayed Project Date 07/01/2010  
Predesign Approval
Design Approval
Bid Auth. Approval 10/24/2008 10/24/2008
Construction Approval 01/01/2009 01/29/2009
Project Closeout 09/30/2010 11/14/2011
Audit Date   11/14/2011
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 95,000 64,380
Other Construction 0 663
Total Construction 95,000 65,043
     
Funding Surplus - 29,957  
Total TIB Funding 65,043 65,043

Local Funding Partners

Funding Amount Percent
NESPELEM 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

The project chip seals the following segments in conjunction with WSDOT North Central Region's 2009 Chip Seal on SR 155 10TH STG ST to C ST28 10TH STC ST to B ST24 5TH/B ST/4THC ST to A ST32 8TH STD ST to A ST36 9TH STG ST to B ST24 C ST10TH ST to 8TH ST63 C ST8TH ST to 5TH ST (E C/L)63 D STSR 155 to 8TH ST32 E STSR 155 to 10TH ST16 F STSR 155 to 9TH ST32 Prep work and pavement repair for the selected segments was completed under SCPP Project #2-E.880(001)-1 in 2008.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments