The existing roads are ready for pavement maintenance. The surface is cracked with areas of alligatoring. Little ditching exists for drainage.
Projects — TIB Project Information
TIB Project Information
Town of Nespelem's Pavement Maintenance Prep Work
2-E-880(001)-1
2-E-880(001)-1
Pavement Maintenance Prep Work
System-wide Improvements
FY 2009 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $135,350
County: Okanogan | Legislative District: 12 | Project Length: 1.58 | TIB Engineer: Andrew Beagle | Last Payment Date: 11/17/2008
Project Information
Lead Agency | NESPELEM |
Funding Year | 2009 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 1.58 mi. |
ADT | 200 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Bryan Hicks |
Contact Email | bhicks@centurywest.com |
TIB Engineer | Andrew Beagle |
Last Payment Date | 11/17/2008 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 06/16/2008 | |
Delayed Project Date | 07/01/2010 | |
Predesign Approval | ||
Design Approval | ||
Bid Auth. Approval | 06/16/2008 | 06/16/2008 |
Construction Approval | 07/21/2008 | 07/23/2008 |
Project Closeout | 12/31/2008 | 11/03/2008 |
Audit Date | 11/17/2008 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 121,800 | 135,350 |
Other Construction | 0 | 0 |
Total Construction | 121,800 | 135,350 |
Funding Increase | 13,550 | |
Total TIB Funding | 135,350 | 135,350 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
NESPELEM | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Provide pavement repair, crack sealing, shoulder grading and ditching and street sweeping. This work prepares the sections for chip seal under the WSDOT North Central Region 2009 Chip Seal,
Existing Condition
Project Benefits
- Prepare sections for Chip Seal;
- Ensures pavement maintenance longevity
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |