The surface shows sign of wear and distress. Transverse and longitudinal cracks allow water to infiltrate the base. The current pavement condition ratings are 63 - Douglas Ave 59 - Lincoln Ave
Projects — TIB Project Information
TIB Project Information
Town of Coulee Dam's FY 2020 Seal Coat Project
2-E-878(004)-1
2-E-878(004)-1
FY 2020 Seal Coat Project
Multiple Locations
FY 2020 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $48,643
County: Okanogan/Douglas/Grant | Legislative District: 12 | Project Length: 0.36 | TIB Engineer: Andrew Beagle | Last Payment Date: 08/11/2020
Project Information
Lead Agency | COULEE DAM |
Funding Year | 2020 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.36 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Stefani Bowden |
Contact Email | cdclerk@couleedam.org |
TIB Engineer | Andrew Beagle |
Last Payment Date | 08/11/2020 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/16/2018 | |
Delayed Project Date | 07/01/2021 | |
Predesign Approval | ||
Design Approval | 01/01/2019 | 12/10/2018 |
Bid Auth. Approval | 04/01/2021 | 01/14/2020 |
Construction Approval | 05/01/2021 | 01/14/2020 |
Project Closeout | 09/01/2020 | 10/16/2020 |
Audit Date | 10/29/2020 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 3,000 | 6,418 |
Right of Way | 0 | 0 |
Total Design | 3,000 | 6,418 |
Construction Engineering | 0 | 255 |
Construction Contract | 78,703 | 41,970 |
Other Construction | 0 | 0 |
Total Construction | 78,703 | 42,225 |
Funding Increase | 0 | |
Funding Surplus | - 33,060 | |
Total TIB Funding | 48,643 | 48,643 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
COULEE DAM | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project provides pavement repair, crack seal and chip seal of the approved segments.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |