The selected segments have pavement conditions ratings that are suitable for chip seal as an effective treatment. Under the SCPP program, these routes were also selected for Sidewalk Maintenance.
Projects — TIB Project Information
TIB Project Information
Town of Coulee Dam's 2009 WSDOT Chip Seal
2-E-878(002)-1
2-E-878(002)-1
2009 WSDOT Chip Seal
Town of Coulee Dam
FY 2010 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $50,285
County: Okanogan/Douglas/Grant | Legislative District: 12 | Project Length: 0.98 | TIB Engineer: Andrew Beagle | Last Payment Date: 10/20/2009
Project Information
Lead Agency | COULEE DAM |
Funding Year | 2010 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.98 mi. |
ADT | 200 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Paul Mahre |
Contact Email | mahrep@wsdot.wa.gov |
TIB Engineer | Andrew Beagle |
Last Payment Date | 10/20/2009 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 10/24/2008 | |
Delayed Project Date | 07/01/2011 | |
Predesign Approval | ||
Design Approval | 10/24/2008 | 10/24/2008 |
Bid Auth. Approval | 10/24/2008 | 10/24/2008 |
Construction Approval | 02/01/2009 | 01/29/2009 |
Project Closeout | 09/30/2010 | 11/14/2011 |
Audit Date | 11/14/2011 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 15,000 | 15,000 |
Right of Way | 0 | 0 |
Total Design | 15,000 | 15,000 |
Construction Engineering | 0 | 0 |
Construction Contract | 55,000 | 35,285 |
Other Construction | 0 | 0 |
Total Construction | 55,000 | 35,285 |
Funding Surplus | - 19,715 | |
Total TIB Funding | 50,285 | 50,285 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
COULEE DAM | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project chip seals the following Coulee Dam segments in conjunction with WSDOT North Central Region's 2009 Chip Seal on SR 155 '11th Street - River Drive to Tilmus - PCR 63 '12th Street - River Drive to Tilmus - PCR 68 'Central Drive - Crest Drive to 12th Street - PCR 63 'Tilmus Street - 11th Street to 12th Street - PCR 77 Design costs for all 2009 NCR chip seals (Coulee Dam, Elmer City, and Nespelem) are included in the Coulee Dam project to streamline billing.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |