Town of Coulee Dam's FY 2009 Sidewalk Maintenance Project
2-E-878(001)-1
2-E-878(001)-1
FY 2009 Sidewalk Maintenance Project
Multiple Locations
FY 2009 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $97,723
County: Okanogan/Douglas/Grant | Legislative District: 12 | Project Length: 3,280.00 | TIB Engineer: Andrew Beagle | Last Payment Date: 02/01/2010
Project Information
Lead Agency | COULEE DAM |
Funding Year | 2009 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 3280.00 mi. |
ADT | 250 |
Functional Class | Local Access |
Type of Work | Pedestrian |
Project Contact | Carol Visker |
Contact Email | cdclerk@couleedam.org |
TIB Engineer | Andrew Beagle |
Last Payment Date | 02/01/2010 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/16/2007 | |
Delayed Project Date | 07/01/2010 | |
Predesign Approval | ||
Design Approval | 01/01/2008 | 03/11/2008 |
Bid Auth. Approval | 01/01/2008 | 03/11/2008 |
Construction Approval | 02/01/2009 | 04/27/2009 |
Project Closeout | 12/31/2009 | 01/12/2010 |
Audit Date | 02/01/2010 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 8,000 |
Right of Way | 0 | 0 |
Total Design | 0 | 8,000 |
Construction Engineering | 0 | 12,000 |
Construction Contract | 80,205 | 102,690 |
Other Construction | 0 | 0 |
Total Construction | 80,205 | 114,690 |
Funding Increase | 17,672 | |
Funding Surplus | - 154 | |
Total TIB Funding | 97,723 | 122,690 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
COULEE DAM | 24,967 | 20.3% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 24,967 | 20.3% |
Project Description
Sidewalk repair of the following segments 11th Street - River Drive to Central Drive 12th Street - River Drive to Central Drive Camas Street - 11th Street to 12th Street Tilmus Street - 11th Street to 12th Street
Existing Condition
Project Benefits
- The existing sidewakl is located in the northern residential seciton of Coulee Dam. Sections of sidewalk are cracked and buckled. The deteriorated sections are a tripping hazard for pedestrians.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |