Many of the streets in the Town are in good shape, but starting to crack. Main Street and Broadway Street, has some rutting in the wheel paths and alligator cracking.
Projects — TIB Project Information
TIB Project Information
Town of Conconully's 2024 Street Maintenance
2-E-877(005)-1
2-E-877(005)-1
2024 Street Maintenance
Multiple Locations
FY 2025 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $92,667
County: Okanogan | Legislative District: 7 | Project Length: 0.00 | TIB Engineer: Andrew Beagle | Last Payment Date: 10/01/2024
Project Information
Lead Agency | CONCONULLY |
Funding Year | 2025 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 7 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Zach Claussen |
Contact Email | zclaussen@townofconconully.com |
TIB Engineer | Andrew Beagle |
Last Payment Date | 10/01/2024 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
Predesign Approval | ||
Design Approval | 02/15/2024 | 01/24/2024 |
Bid Auth. Approval | 05/15/2024 | 01/24/2024 |
Construction Approval | 06/24/2024 | 07/24/2024 |
Project Closeout | 10/31/2024 | 09/24/2024 |
Audit Date | 10/01/2024 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 114,500 | 97,667 |
Other Construction | 0 | 0 |
Total Construction | 114,500 | 97,667 |
Funding Surplus | - 21,833 | |
Total TIB Funding | 92,667 | 97,667 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
CONCONULLY | 5,000 | 5.1% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 5,000 | 5.1% |
Project Description
Town-wide crack sealing and pavement repair at the Main Street and Broadway Street intersection.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |