existing surfaces are very deteriorated as indicated by the pavement condition rating (PCR) PCR 41 Bernice Ave Broadway to Silver PCR 45 La Una Lottie to Main PCR 45 Silver St Bernice to Main
Projects — TIB Project Information
TIB Project Information
Town of Conconully's FY 2018 Rehabilitation Project
2-E-877(003)-1
2-E-877(003)-1
FY 2018 Rehabilitation Project
Multiple Locations
FY 2018 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $348,391
County: Okanogan | Legislative District: 7 | Project Length: 0.35 | TIB Engineer: Andrew Beagle | Last Payment Date: 01/30/2019
Project Information
Lead Agency | CONCONULLY |
Funding Year | 2018 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 7 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.35 mi. |
ADT | 200 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Zac Claussen |
Contact Email | zclaussen@townofconconully.com |
TIB Engineer | Andrew Beagle |
Last Payment Date | 01/30/2019 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/18/2016 | |
Delayed Project Date | 07/01/2019 | |
Predesign Approval | ||
Design Approval | 01/01/2017 | 12/15/2016 |
Bid Auth. Approval | 02/01/2018 | 03/14/2018 |
Construction Approval | 06/14/2018 | 06/28/2018 |
Project Closeout | 12/31/2018 | 01/03/2019 |
Audit Date | 01/30/2019 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 55,903 | 81,000 |
Right of Way | 0 | 0 |
Total Design | 55,903 | 81,000 |
Construction Engineering | 40,659 | 0 |
Construction Contract | 253,438 | 291,675 |
Other Construction | 0 | 763 |
Total Construction | 294,097 | 292,438 |
Funding Increase | 21,500 | |
Funding Surplus | - 23,109 | |
Total TIB Funding | 348,391 | 373,438 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
CONCONULLY | 25,047 | 6.7% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 25,047 | 6.7% |
Project Description
The project provides a two-in HMA overlay on the following sections Bernice Ave - Broadway to Silver La Una - Lottie to Main Silver St - Bernice to Main Based on the meeting at the 2017 IACC Conference, the approved scope was amended to include design on the following sections Boone - Lottie to Main Lottie - Lake to Boone Lake - Lottie to Main La Una - Bernice to Lottie Work on the additional sections is limited to profile of the streets with a two-inch HMA overlay. Other improvements include installation by the town of three culverts and two irrigation crossings.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |