The existing surface is wearing. It serves a concrete plant and is an east-west connector in the south section of Brewster.
Projects — TIB Project Information
TIB Project Information
City of Brewster's FY 2019 Seal Coat Project
2-E-876(003)-1
2-E-876(003)-1
FY 2019 Seal Coat Project
Multiple Locations
FY 2019 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $69,435
County: Okanogan | Legislative District: 12 | Project Length: 0.18 | TIB Engineer: Andrew Beagle | Last Payment Date: 12/12/2018
Project Information
Lead Agency | BREWSTER |
Funding Year | 2019 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.18 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Lee Webster |
Contact Email | Lee.Webster@brewsterwa.us |
TIB Engineer | Andrew Beagle |
Last Payment Date | 12/12/2018 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/17/2017 | |
Delayed Project Date | 07/01/2020 | |
Predesign Approval | ||
Design Approval | 01/01/2018 | 04/17/2018 |
Bid Auth. Approval | 05/01/2018 | 04/17/2018 |
Construction Approval | 06/01/2018 | 04/17/2018 |
Project Closeout | 12/31/2018 | 11/27/2018 |
Audit Date | 12/12/2018 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 39,779 | 42,944 |
Other Construction | 0 | 30,147 |
Total Construction | 39,779 | 73,091 |
Funding Increase | 29,656 | |
Total TIB Funding | 69,435 | 73,091 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
BREWSTER | 3,655 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 3,655 | 5.0% |
Project Description
The project seals cracks, repairs pavement and chip seals the surface.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |