City of Sprague's FY 2020 Rehabilitation Project

2-E-874(007)-2

2-E-874(007)-2
FY 2020 Rehabilitation Project

Multiple Locations

FY 2020 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $30,699

County: Lincoln   |   Legislative District: 13   |   Project Length: 0.43   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 02/16/2021

Project Information

Lead Agency SPRAGUE
Funding Year 2020
Program SCPP
Current Phase Audit
Legislative District 13
Congressional District 5
Federal Route Number 9999
Project Length 0.43 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Reconstruction
Project Contact Lexi Behrens
Contact Email cityhall@sprague-wa.us
TIB Engineer Andrew Beagle
Last Payment Date 02/16/2021

Project Schedule

  Target Date Actual Date
Project Selection Date   11/16/2018
Delayed Project Date 07/01/2021  
Predesign Approval
Design Approval
Bid Auth. Approval 04/01/2019 04/01/2019
Construction Approval 04/01/2019 04/01/2019
Project Closeout 12/31/2020 02/01/2021
Audit Date   02/16/2021
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 9,760 0
Construction Contract 23,081 0
Other Construction 0 30,699
Total Construction 32,841 30,699
     
Funding Surplus - 2,142  
Total TIB Funding 30,699 30,699

Local Funding Partners

Funding Amount Percent
SPRAGUE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

The project provides full depth reclamation (FDR) with cement treated based and two inch overlay of 3rd Street. ADA ramp upgrades are part of the approved scope. The project includes overlay of 1st St from Dayton Street to Walnut Loop. This section will be included in Lincoln County's overlay of the Sprague Highway.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.