The pavement condition rating of 1st Street - Dayton Street to Walnut Loop 50
Projects — TIB Project Information
TIB Project Information
City of Sprague's FY 2020 Rehabilitation Project
2-E-874(007)-2
2-E-874(007)-2
FY 2020 Rehabilitation Project
Multiple Locations
FY 2020 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $30,699
County: Lincoln | Legislative District: 13 | Project Length: 0.43 | TIB Engineer: Andrew Beagle | Last Payment Date: 02/16/2021
Project Information
Lead Agency | SPRAGUE |
Funding Year | 2020 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 13 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.43 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Lexi Behrens |
Contact Email | cityhall@sprague-wa.us |
TIB Engineer | Andrew Beagle |
Last Payment Date | 02/16/2021 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/16/2018 | |
Delayed Project Date | 07/01/2021 | |
Predesign Approval | ||
Design Approval | ||
Bid Auth. Approval | 04/01/2019 | 04/01/2019 |
Construction Approval | 04/01/2019 | 04/01/2019 |
Project Closeout | 12/31/2020 | 02/01/2021 |
Audit Date | 02/16/2021 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 9,760 | 0 |
Construction Contract | 23,081 | 0 |
Other Construction | 0 | 30,699 |
Total Construction | 32,841 | 30,699 |
Funding Surplus | - 2,142 | |
Total TIB Funding | 30,699 | 30,699 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SPRAGUE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project provides full depth reclamation (FDR) with cement treated based and two inch overlay of 3rd Street. ADA ramp upgrades are part of the approved scope. The project includes overlay of 1st St from Dayton Street to Walnut Loop. This section will be included in Lincoln County's overlay of the Sprague Highway.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |