The TIB arterials selected for overlay are Fourth Street - H St to B St with a PCR of 41
Projects — TIB Project Information
TIB Project Information
City of Sprague's FY 2014 Red Town Project
2-E-874(006)-1
2-E-874(006)-1
FY 2014 Red Town Project
Multiple Locations
FY 2014 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $342,299
County: Lincoln | Legislative District: 13 | Project Length: 0.53 | TIB Engineer: Andrew Beagle | Last Payment Date: 03/03/2014
Project Information
Lead Agency | SPRAGUE |
Funding Year | 2014 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 13 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.53 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Ginny Rajala |
Contact Email | grajala@sprague-wa.us |
TIB Engineer | Andrew Beagle |
Last Payment Date | 03/03/2014 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/16/2012 | |
Delayed Project Date | 07/01/2015 | |
Predesign Approval | ||
Design Approval | 01/01/2013 | 01/23/2013 |
Bid Auth. Approval | 06/14/2013 | 06/19/2013 |
Construction Approval | 07/15/2013 | 07/17/2013 |
Project Closeout | 03/01/2014 | 02/25/2014 |
Audit Date | 03/03/2014 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 20,000 | 36,018 |
Right of Way | 0 | 0 |
Total Design | 20,000 | 36,018 |
Construction Engineering | 20,000 | 37,802 |
Construction Contract | 210,000 | 268,479 |
Other Construction | 0 | 0 |
Total Construction | 230,000 | 306,281 |
Funding Increase | 99,346 | |
Funding Surplus | - 7,047 | |
Total TIB Funding | 342,299 | 342,299 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SPRAGUE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project grinds and overlays the existing roadway surface. Sidewalk repair and upgrade or installation of ADA ramps ensures accessibility. The following segments were designed as part of this project. Construction funding for will be provided under TIB Project #2-E-874(004)-1, FY 2013 Overlay Project F Street - 4th St to 5th St with a pavement condition rating (PCR) of 50 Fifth Street - G St to F St with a PCR of 50 G Street - 4th St to 5th St with a PCR of 32
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |