Current Phase : Audit
Total TIB Funding : $132,041

County: Lincoln   |   Legislative District: 13   |   Project Length: 0.15   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 03/03/2014

Project Information

Lead Agency SPRAGUE
Funding Year 2013
Program SCPP
Current Phase Audit
Legislative District 13
Congressional District 5
Federal Route Number J220
Project Length 0.15 mi.
ADT 127
Functional Class Collector
Type of Work Resurfacing
Project Contact Ginny Rajala
Contact Email grajala@sprague-wa.us
TIB Engineer Andrew Beagle
Last Payment Date 03/03/2014

Project Schedule

  Target Date Actual Date
Project Selection Date   11/18/2011
Delayed Project Date 07/01/2014  
Predesign Approval
Design Approval 07/30/2012 06/19/2013
Bid Auth. Approval 06/14/2013 06/19/2013
Construction Approval 07/15/2013 07/17/2013
Project Closeout 03/01/2014 02/25/2014
Audit Date   03/03/2014
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 19,833
Construction Contract 155,250 112,209
Other Construction 0 0
Total Construction 155,250 132,041
     
Funding Increase 10,123  
Funding Surplus - 33,332  
Total TIB Funding 132,041 132,041

Local Funding Partners

Funding Amount Percent
SPRAGUE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

The project scope was revised due to funding the city received in 2013. Improvements on 1st Street are included in a funded SCAP project. The revised scope for the project provides pavement repair, overlay and sidewalk/ADA upgrades along the following streets F Street - 4th St to 5th St with a pavement condition rating (PCR) of 50 Fifth Street - G St to F St with a PCR of 50 G Street - 4th St to 5th St with a PCR of 32 ORIGINAL SCOPE The project repairs potholed areas, lays geotextile fabric to bridge deficient areas and places a 2-in overlay on G Street and the west end of 1st Street.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.