City of Sprague's FY 2010 Sidewalk Maintenance Project

2-E-874(002)-1

2-E-874(002)-1
FY 2010 Sidewalk Maintenance Project

C Street - 2nd St to Boxcar St

FY 2010 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $31,165

County: Lincoln   |   Legislative District: 13   |   Project Length: 0.00   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 03/22/2011

Project Information

Lead Agency SPRAGUE
Funding Year 2010
Program SCPP
Current Phase Audit
Legislative District 13
Congressional District 5
Federal Route Number 9999
Project Length 0.00 mi.
ADT 150
Functional Class TIB Arterial
Type of Work Pedestrian
Project Contact Ginny Rajala
Contact Email ginnyr@sprague-wa.us
TIB Engineer Andrew Beagle
Last Payment Date 03/22/2011

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2008
Delayed Project Date 07/01/2011  
Predesign Approval
Design Approval 02/01/2009 01/20/2009
Bid Auth. Approval 02/01/2009 01/20/2009
Construction Approval 05/01/2011 07/01/2010
Project Closeout 12/31/2010 03/22/2011
Audit Date   03/22/2011
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 27,922 31,165
Other Construction 0 0
Total Construction 27,922 31,165
     
Funding Increase 3,243  
Total TIB Funding 31,165 31,165

Local Funding Partners

Funding Amount Percent
SPRAGUE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

This project will restore damaged sidewalk in the downtown CBD. During design the scope was modified to repair sidewalk on C Street between Boxcar St and 2nd St.

Project Pictures

No images available.

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments