TIB Project Information

Town of Reardan's FY 2019 Rehabilitation Project

2-E-873(005)-1

2-E-873(005)-1
FY 2019 Rehabilitation Project

FDR with Overlay

FY 2019 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0

County: Lincoln   |   Legislative District: 13   |   Project Length: 0.19   |   TIB Engineer: Andrew Beagle   |   Last Payment Date:

Project Information

Lead Agency REARDAN
Funding Year 2019
Program SCPP
Current Phase Withdrawn
Legislative District 13
Congressional District 5
Federal Route Number 9999
Project Length 0.19 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Jeff Evers
Contact Email townofreardan@gmail.com
TIB Engineer Andrew Beagle
Last Payment Date

Project Schedule

  Target Date Actual Date
Project Selection Date   11/17/2017
Delayed Project Date 07/01/2020  
Predesign Approval
Design Approval 01/01/2018
Bid Auth. Approval 04/01/2018
Construction Approval 05/01/2018
Project Closeout 10/31/2018
Audit Date  
Withdrawn Date   01/24/2018

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 0 0
Other Construction 0 0
Total Construction 0 0
     
Total TIB Funding 0 0

Local Funding Partners

Funding Amount Percent
REARDAN 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

The project provides full depth reclamation and overlay.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.