The existing streets have little to no base. Surface deterioration is too extensive for a typical chip seal or overlay. Current pavement condition ratings for the streets are 41 Cottonwood Ave - Maple to Laurel 41 Spokane Ave - Cedar to Green 50 Green St - Spokane to US 2
Projects — TIB Project Information
TIB Project Information
Town of Reardan's FY 2019 Rehabilitation Project
2-E-873(004)-1
2-E-873(004)-1
FY 2019 Rehabilitation Project
FDR w/Overlay - Cottonwood; FDR w/Chip - Spokane/Green
FY 2019 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $307,237
County: Lincoln | Legislative District: 13 | Project Length: 0.35 | TIB Engineer: Andrew Beagle | Last Payment Date: 03/01/2019
Project Information
Lead Agency | REARDAN |
Funding Year | 2019 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 13 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.35 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Jeff Evers |
Contact Email | townofreardan@gmail.com |
TIB Engineer | Andrew Beagle |
Last Payment Date | 03/01/2019 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/17/2017 | |
Delayed Project Date | 07/01/2020 | |
Predesign Approval | ||
Design Approval | 01/01/2018 | 01/24/2018 |
Bid Auth. Approval | 04/01/2018 | 05/01/2018 |
Construction Approval | 05/15/2018 | 05/29/2018 |
Project Closeout | 12/31/2018 | 02/26/2019 |
Audit Date | 03/01/2019 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 24,080 | 24,198 |
Right of Way | 0 | 0 |
Total Design | 24,080 | 24,198 |
Construction Engineering | 30,637 | 31,792 |
Construction Contract | 218,241 | 254,277 |
Other Construction | 0 | 0 |
Total Construction | 248,878 | 286,069 |
Funding Increase | 34,279 | |
Total TIB Funding | 307,237 | 310,268 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
REARDAN | 3,031 | 1.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 3,031 | 1.0% |
Project Description
The project improvements include full depth reclamation (FDR) of the selected street sections to provide adequate base. On Cottonwood, the project provides a HMA overlay to cap the FDR. Chip seal caps the FDR on Spokane Avenue and Green Street.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |