Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

Town of Odessa's 2024 Maintenance Project

2-E-872(004)-1

2-E-872(004)-1
2024 Maintenance Project

Multiple Locations

FY 2025 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $165,377

County: Lincoln   |   Legislative District: 9   |   Project Length: 0.00   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 09/13/2024

Project Information

Lead Agency ODESSA
Funding Year 2025
Program SCPP
Current Phase Audit
Legislative District 9
Congressional District 5
Federal Route Number 9999
Project Length 0.00 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Trent Ward
Contact Email tward@centurywest.com
TIB Engineer Andrew Beagle
Last Payment Date 09/13/2024

Project Schedule

  Target Date Actual Date
Project Selection Date   12/01/2023
Delayed Project Date 07/01/2026  
Predesign Approval
Design Approval 02/01/2024 12/13/2023
Bid Auth. Approval 04/30/2024 12/13/2023
Construction Approval 06/15/2024 05/17/2024
Project Closeout 12/31/2024 09/09/2024
Audit Date   09/13/2024
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 190,630 165,377
Other Construction 0 0
Total Construction 190,630 165,377
     
Funding Increase 47,895  
Funding Surplus - 73,148  
Total TIB Funding 165,377 165,377

Local Funding Partners

Funding Amount Percent
ODESSA 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

Clean and install crack sealant and dig out and repair areas of pavement degradation that are not practical to crack seal or chip seal

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments