The surface of Linden Street from the west city limit to SR 28 shows signs of deterioration. Transverse and longitudinal cracking is evident. The current pavement condition rating is 63.
Projects — TIB Project Information
TIB Project Information
City of Harrington's FY 2017 Seal Coat Project
2-E-871(001)-1
2-E-871(001)-1
FY 2017 Seal Coat Project
Multiple Locations
FY 2017 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $5,542
County: Lincoln | Legislative District: 13 | Project Length: 0.21 | TIB Engineer: Andrew Beagle | Last Payment Date: 11/06/2016
Project Information
Lead Agency | HARRINGTON |
Funding Year | 2017 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 13 |
Congressional District | 5 |
Federal Route Number | D220 |
Project Length | 0.21 mi. |
ADT | 150 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Bunny Haugan |
Contact Email | harringtoncity@gmail.com |
TIB Engineer | Andrew Beagle |
Last Payment Date | 11/06/2016 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/20/2015 | |
Delayed Project Date | 07/01/2018 | |
Predesign Approval | ||
Design Approval | 01/15/2016 | 12/21/2015 |
Bid Auth. Approval | 05/01/2016 | 12/21/2015 |
Construction Approval | 06/01/2016 | 12/21/2015 |
Project Closeout | 03/01/2017 | 02/23/2017 |
Audit Date | 02/23/2017 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 51 |
Construction Contract | 18,025 | 5,491 |
Other Construction | 0 | 0 |
Total Construction | 18,025 | 5,542 |
Funding Surplus | - 12,483 | |
Total TIB Funding | 5,542 | 5,542 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
HARRINGTON | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The city crack sealed Linden Street. The street is ready for surface treatment. Lincoln County agreed to chip seal the street in conjunction with the County's 2016 Chip Seal Program.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |