The existing surface is showing signs of deterioration and ready for maintenance to extend life on Gunning Rd between Morgan St (US 2) and the North City Limits.
Projects — TIB Project Information
TIB Project Information
City of Davenport's FY 2022 Seal Coat Project
2-E-870(004)-1
2-E-870(004)-1
FY 2022 Seal Coat Project
Multiple Locations
FY 2022 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $9,175
County: Lincoln | Legislative District: 13 | Project Length: 0.25 | TIB Engineer: Andrew Beagle | Last Payment Date: 11/01/2021
Project Information
Lead Agency | DAVENPORT |
Funding Year | 2022 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 13 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.25 mi. |
ADT | 0 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Fred Bell |
Contact Email | fredbell@centurytel.net |
TIB Engineer | Andrew Beagle |
Last Payment Date | 11/01/2021 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 03/22/2021 | |
Delayed Project Date | 07/01/2023 | |
Predesign Approval | ||
Design Approval | 04/30/2021 | 03/24/2021 |
Bid Auth. Approval | 03/22/2021 | 03/24/2021 |
Construction Approval | 03/24/2021 | 03/24/2021 |
Project Closeout | 10/31/2021 | 10/20/2021 |
Audit Date | 11/01/2021 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 12,284 | 9,175 |
Other Construction | 0 | 0 |
Total Construction | 12,284 | 9,175 |
Funding Surplus | - 3,109 | |
Total TIB Funding | 9,175 | 9,175 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
DAVENPORT | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project seals cracks, repairs pavement and chip seals the surface on Gunning Rd between Morgan St (US 2) and North City Limits.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |