Approximately 100 feet of the existing rock wall on the west side of 7th Street collapsed. The cut area is not stable with debris sloughing onto the sidewalk.
Projects — TIB Project Information
TIB Project Information
City of Davenport's 7th Street Wall Repair
2-E-870(001)-1
2-E-870(001)-1
7th Street Wall Repair
Marshall to Park
FY 2015 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $77,584
County: Lincoln | Legislative District: 13 | Project Length: 0.02 | TIB Engineer: Andrew Beagle | Last Payment Date: 12/29/2015
Project Information
Lead Agency | DAVENPORT |
Funding Year | 2015 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 13 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.02 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Steve Goemmel |
Contact Email | sjgoemmel@centurytel.net |
TIB Engineer | Andrew Beagle |
Last Payment Date | 12/29/2015 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 04/28/2015 | |
Delayed Project Date | 07/01/2017 | |
Predesign Approval | ||
Design Approval | 04/28/2015 | 04/28/2015 |
Bid Auth. Approval | 04/28/2015 | 04/28/2015 |
Construction Approval | 07/16/2015 | 07/20/2015 |
Project Closeout | 12/31/2015 | 12/17/2015 |
Audit Date | 12/29/2015 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 5,000 | 5,000 |
Right of Way | 0 | 0 |
Total Design | 5,000 | 5,000 |
Construction Engineering | 2,800 | 2,800 |
Construction Contract | 59,807 | 69,784 |
Other Construction | 0 | 0 |
Total Construction | 62,607 | 72,584 |
Funding Increase | 9,977 | |
Total TIB Funding | 77,584 | 77,584 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
DAVENPORT | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project removes and replaces the collapsed wall. The scope includes reconstruction of the existing sidewalk in front of the wall.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |