On 3rd Street from Oak Street to Main Street, 975 feet of damaged and buckled sidewalk exists along the east side of the street.
Projects — TIB Project Information
TIB Project Information
Town of Almira's FY 2014 Sidewalk Maintenance Project
2-E-868(004)-1
2-E-868(004)-1
FY 2014 Sidewalk Maintenance Project
Multiple Locations
FY 2014 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $93,687
County: Lincoln | Legislative District: 13 | Project Length: 0.00 | TIB Engineer: Andrew Beagle | Last Payment Date: 01/15/2014
Project Information
Lead Agency | ALMIRA |
Funding Year | 2014 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 13 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Pedestrian |
Project Contact | Jeanette Coppersmith |
Contact Email | townhall@televar.com |
TIB Engineer | Andrew Beagle |
Last Payment Date | 01/15/2014 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/16/2012 | |
Delayed Project Date | 07/01/2015 | |
Predesign Approval | ||
Design Approval | 01/01/2013 | 01/10/2013 |
Bid Auth. Approval | 06/01/2013 | 06/19/2013 |
Construction Approval | 07/01/2013 | 07/25/2013 |
Project Closeout | 12/31/2013 | 12/19/2013 |
Audit Date | 01/15/2014 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 11,110 | 11,110 |
Right of Way | 0 | 0 |
Total Design | 11,110 | 11,110 |
Construction Engineering | 11,110 | 11,220 |
Construction Contract | 74,120 | 71,357 |
Other Construction | 0 | 0 |
Total Construction | 85,230 | 82,577 |
Funding Increase | 4,107 | |
Funding Surplus | - 6,760 | |
Total TIB Funding | 93,687 | 93,687 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
ALMIRA | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project repairs sidewalk along the east side of 3rd Street between Oak Street and Main Street. The project completes the sidewalk system upgrade on this corridor.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |