There are several potholes in need of repair throughout the Town. Crack Sealing is needed on many streets to protect against pavement deterioration
Projects — TIB Project Information
TIB Project Information
Town of Wilson Creek's 2024 Street Maintenance
2-E-867(008)-1
2-E-867(008)-1
2024 Street Maintenance
Multiple Locations
FY 2025 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0
County: Grant | Legislative District: 7 | Project Length: 0.00 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
Lead Agency | WILSON CREEK |
Funding Year | 2025 |
Program | SCPP |
Current Phase | Withdrawn |
Legislative District | 7 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Kaci Anderson |
Contact Email | clerk@wilsoncreekwa.com |
TIB Engineer | Andrew Beagle |
Last Payment Date |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
Predesign Approval | ||
Design Approval | 02/01/2024 | 01/18/2024 |
Bid Auth. Approval | 05/15/2024 | 01/18/2024 |
Construction Approval | 06/30/2024 | |
Project Closeout | 09/30/2024 | |
Audit Date | ||
Withdrawn Date | 09/16/2024 |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 32,200 | 32,200 |
Other Construction | 0 | 0 |
Total Construction | 32,200 | 32,200 |
Total TIB Funding | 0 | 32,200 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
WILSON CREEK | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Crack Sealing of cracks 1/4 or widerMastic Repair for wide cracksPavement Repair of potholes and areas where pavement is rapidly deteriorating and blowing out.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |