The existing pavement is fair to good condition. The are pedestrian facilities within the project limit. ADA ramps and driveways don't meet current ADA standards. The PCR rating for the selected segment is as follows Main Avenue/Division St - Aster St to 2nd 67
Projects — TIB Project Information
TIB Project Information
City of Soap Lake's FY 2014 Red Town Project
2-E-865(006)-1
2-E-865(006)-1
FY 2014 Red Town Project
Aster Street to 2nd Avenue
FY 2014 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0
County: Grant | Legislative District: 12 | Project Length: 0.24 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
Lead Agency | SOAP LAKE |
Funding Year | 2014 |
Program | SCPP |
Current Phase | Withdrawn |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.24 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Mayor Raymond Gravelle |
Contact Email | aladmin@smwireless.net |
TIB Engineer | Andrew Beagle |
Last Payment Date |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/16/2012 | |
Delayed Project Date | 07/01/2015 | |
Predesign Approval | ||
Design Approval | 02/01/2013 | |
Bid Auth. Approval | 06/01/2013 | |
Construction Approval | 07/01/2013 | |
Project Closeout | 10/31/2013 | |
Audit Date | ||
Withdrawn Date | 02/13/2013 |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 0 | 0 |
Other Construction | 0 | 0 |
Total Construction | 0 | 0 |
Total TIB Funding | 0 | 0 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SOAP LAKE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
This project will construct new curb gutter and sidewalk with ADA ramps on both sides of the roadway. The existing pavement will be planned and overlayed. This project will also include illumination and improvements to the existing storm water drainage system.
Existing Condition
Project Benefits
- Completes gap;
- Extends improvements in CBD;
- Promotes economic development
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |