The PCR score for this section of roadway inidicates reconstruction is the best option.
Projects — TIB Project Information
TIB Project Information
City of Soap Lake's Division Street
2-E-865(005)-1
2-E-865(005)-1
Division Street
2nd Ave SE to 7th Ave SE
FY 2010 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $791,227
County: Grant | Legislative District: 12 | Project Length: 0.27 | TIB Engineer: Andrew Beagle | Last Payment Date: 08/18/2011
Project Information
Lead Agency | SOAP LAKE |
Funding Year | 2010 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | D132 |
Project Length | 0.27 mi. |
ADT | 1,574 |
Functional Class | Collector |
Type of Work | Reconstruction |
Project Contact | Wayne Hovde |
Contact Email | istigall@smwireless.net |
TIB Engineer | Andrew Beagle |
Last Payment Date | 08/18/2011 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 10/08/2009 | |
Delayed Project Date | 07/01/2012 | |
Predesign Approval | ||
Design Approval | 03/03/2010 | 10/08/2009 |
Bid Auth. Approval | 04/01/2010 | 05/21/2010 |
Construction Approval | 06/10/2010 | 06/17/2010 |
Project Closeout | 06/30/2011 | 08/18/2011 |
Audit Date | 08/18/2011 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 83,400 | 94,628 |
Right of Way | 0 | 2,658 |
Total Design | 83,400 | 97,286 |
Construction Engineering | 76,450 | 112,872 |
Construction Contract | 535,150 | 675,786 |
Other Construction | 0 | 757 |
Total Construction | 611,600 | 789,414 |
Funding Increase | 96,464 | |
Funding Surplus | - 237 | |
Total TIB Funding | 791,227 | 886,701 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SOAP LAKE | 95,474 | 10.8% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 95,474 | 10.8% |
Project Description
This project reconstructs the existing two-lane roadway with parking on each side of the roadway. The project includes repair of existing curb, gutter and sidewalks as needed. Installation of sidewalk ramps ensures ADA accessibility. Improvements to the storm water drainage system are included to provide adequate collection & treatment.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |