TIB Project Information

City of Soap Lake's Division Street

2-E-865(005)-1

2-E-865(005)-1
Division Street

2nd Ave SE to 7th Ave SE

FY 2010 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $791,227

County: Grant   |   Legislative District: 12   |   Project Length: 0.27   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 08/18/2011

Project Information

Lead Agency SOAP LAKE
Funding Year 2010
Program SCPP
Current Phase Audit
Legislative District 12
Congressional District 4
Federal Route Number D132
Project Length 0.27 mi.
ADT 1,574
Functional Class Collector
Type of Work Reconstruction
Project Contact Wayne Hovde
Contact Email istigall@smwireless.net
TIB Engineer Andrew Beagle
Last Payment Date 08/18/2011

Project Schedule

  Target Date Actual Date
Project Selection Date   10/08/2009
Delayed Project Date 07/01/2012  
Predesign Approval
Design Approval 03/03/2010 10/08/2009
Bid Auth. Approval 04/01/2010 05/21/2010
Construction Approval 06/10/2010 06/17/2010
Project Closeout 06/30/2011 08/18/2011
Audit Date   08/18/2011
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 83,400 94,628
Right of Way 0 2,658
Total Design 83,400 97,286
     
Construction Engineering 76,450 112,872
Construction Contract 535,150 675,786
Other Construction 0 757
Total Construction 611,600 789,414
     
Funding Increase 96,464  
Funding Surplus - 237  
Total TIB Funding 791,227 886,701

Local Funding Partners

Funding Amount Percent
SOAP LAKE 95,474 10.8%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 95,474 10.8%

Project Description

This project reconstructs the existing two-lane roadway with parking on each side of the roadway. The project includes repair of existing curb, gutter and sidewalks as needed. Installation of sidewalk ramps ensures ADA accessibility. Improvements to the storm water drainage system are included to provide adequate collection & treatment.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.