Task 1 The existing roadway system is in poor condition. Task 2 The existing pederstrian facilities are in poor condition.
Projects — TIB Project Information
TIB Project Information
City of Soap Lake's FY 2010 Overlay Project
2-E-865(004)-1
2-E-865(004)-1
FY 2010 Overlay Project
Misc Projects
FY 2010 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $178,009
County: Grant | Legislative District: 12 | Project Length: 0.21 | TIB Engineer: Andrew Beagle | Last Payment Date: 05/15/2012
Project Information
Lead Agency | SOAP LAKE |
Funding Year | 2010 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.21 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Raymond Gravelle |
Contact Email | mayor@soaplakecity.org |
TIB Engineer | Andrew Beagle |
Last Payment Date | 05/15/2012 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/21/2008 | |
Delayed Project Date | 07/01/2011 | |
Predesign Approval | ||
Design Approval | 03/01/2010 | 01/11/2010 |
Bid Auth. Approval | 08/01/2011 | 08/04/2011 |
Construction Approval | 09/15/2011 | 09/21/2011 |
Project Closeout | 12/31/2011 | 04/24/2012 |
Audit Date | 05/15/2012 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 29,750 | 29,750 |
Right of Way | 0 | 0 |
Total Design | 29,750 | 29,750 |
Construction Engineering | 18,500 | 15,680 |
Construction Contract | 119,495 | 132,579 |
Other Construction | 0 | 0 |
Total Construction | 137,995 | 148,259 |
Funding Increase | 10,264 | |
Total TIB Funding | 178,009 | 178,009 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SOAP LAKE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Task No 1 Develop a Transportation Facility Preservation and Prioritization Plan. Gray & Osborne is rating the pavement. They will provide TIB with the rating when complete. Task No 2 The project will replace existing deteriorated curb, gutter, sidewalk and driveway entrances as directed by the engineer. This work will be on 2nd Street between Juniper St and Daisy St.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |