City of Soap Lake's FY 2009 Sidewalk Maintenance Project

2-E-865(003)-1

2-E-865(003)-1
FY 2009 Sidewalk Maintenance Project

Multiple Locations

FY 2009 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0

County: Grant   |   Legislative District: 12   |   Project Length: 0.23   |   TIB Engineer: Andrew Beagle   |   Last Payment Date:

Project Information

Lead Agency SOAP LAKE
Funding Year 2009
Program SCPP
Current Phase Withdrawn
Legislative District 12
Congressional District 4
Federal Route Number 9999
Project Length 0.23 mi.
ADT 250
Functional Class TIB Arterial
Type of Work Pedestrian
Project Contact Debbie Amundson
Contact Email cityhall@soaplakecity.org
TIB Engineer Andrew Beagle
Last Payment Date

Project Schedule

  Target Date Actual Date
Project Selection Date   11/16/2007
Delayed Project Date 07/01/2010  
Predesign Approval
Design Approval 01/01/2008 02/28/2008
Bid Auth. Approval 01/01/2008 02/28/2008
Construction Approval 04/01/2009
Project Closeout 10/31/2009
Audit Date  
Withdrawn Date   05/22/2009

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 0 0
Other Construction 0 0
Total Construction 0 0
     
Total TIB Funding 0 0

Local Funding Partners

Funding Amount Percent
SOAP LAKE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

Replace Sidewalk and add ADA ramps on both sides of the roadway along Main Avenue West between Dogwood Street and Juniper Street.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.