The PCR score for this section of roadway inidicates reconstruction is the best option.
Projects — TIB Project Information
TIB Project Information
City of Soap Lake's Main Ave Overlay Project
2-E-865(001)-1
2-E-865(001)-1
Main Ave Overlay Project
Cherry St to Division St
FY 2009 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $318,604
County: Grant | Legislative District: 12 | Project Length: 0.38 | TIB Engineer: Andrew Beagle | Last Payment Date: 04/13/2010
Project Information
Lead Agency | SOAP LAKE |
Funding Year | 2009 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.38 mi. |
ADT | 250 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Debbie Amundson |
Contact Email | cityhall@soaplakecity.org |
TIB Engineer | Andrew Beagle |
Last Payment Date | 04/13/2010 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/16/2007 | |
Delayed Project Date | 07/01/2010 | |
Predesign Approval | ||
Design Approval | 01/01/2008 | 02/28/2008 |
Bid Auth. Approval | 01/01/2008 | 02/28/2008 |
Construction Approval | 07/01/2009 | 07/21/2009 |
Project Closeout | 02/01/2010 | 04/16/2010 |
Audit Date | 04/16/2010 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 16,000 | 16,000 |
Right of Way | 0 | 0 |
Total Design | 16,000 | 16,000 |
Construction Engineering | 40,000 | 39,995 |
Construction Contract | 244,673 | 262,609 |
Other Construction | 0 | 0 |
Total Construction | 284,673 | 302,604 |
Funding Increase | 17,931 | |
Total TIB Funding | 318,604 | 318,604 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SOAP LAKE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
This project consist of reconstructing the existing two lane roadway with parking on each side of the roadway. The project will include repairing the existing the curb, gutter, and sidewalks as needed. ADA ramps will be constructed as needed. The storm water system will be repaired or replaced as needed.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |