Existing roadway asphalt grinding over native material.
Projects — TIB Project Information
TIB Project Information
Town of Mattawa's FY 2009 Overlay Project
2-E-862(001)-1
2-E-862(001)-1
FY 2009 Overlay Project
Multiple Locations
FY 2009 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $211,700
County: Grant | Legislative District: 13 | Project Length: 0.56 | TIB Engineer: Jonathan Heusman | Last Payment Date: 12/01/2008
Project Information
Lead Agency | MATTAWA |
Funding Year | 2009 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 13 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.56 mi. |
ADT | 200 |
Functional Class | Local Access |
Type of Work | Resurfacing |
Project Contact | Patricia Gerdes |
Contact Email | townhall@gemsi.com |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 12/01/2008 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 07/10/2008 | |
Delayed Project Date | 07/01/2011 | |
Predesign Approval | ||
Design Approval | ||
Bid Auth. Approval | 06/15/2008 | 06/15/2008 |
Construction Approval | 07/15/2008 | 07/11/2008 |
Project Closeout | 09/15/2008 | 11/21/2008 |
Audit Date | 12/01/2008 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 225,336 | 211,700 |
Other Construction | 0 | 0 |
Total Construction | 225,336 | 211,700 |
Funding Surplus | - 13,636 | |
Total TIB Funding | 211,700 | 211,700 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
MATTAWA | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project consist of base preparation and 2 in overlay of the following segments Portage Avenue - Government Wy to 4th St 4th Street - Portage Ave to Selkirk Ave
Existing Condition
Project Benefits
- Restores Roadway Surface;
- Reduces Maintenance Costs
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |