Projects — TIB Project Information
TIB Project Information
City of George's 2022 Overlay Award
2-E-858(007)-1
2-E-858(007)-1
2022 Overlay Award
Washington Wy to E Deacon St
FY 2024 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $409,998
County: Grant | Legislative District: 13 | Project Length: 0.34 | TIB Engineer: Jonathan Heusman | Last Payment Date: 08/14/2024
Project Information
Lead Agency | GEORGE |
Funding Year | 2024 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 13 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.34 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Don Entzel |
Contact Email | mayor@cityofgeorge.org |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 08/14/2024 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
Predesign Approval | ||
Design Approval | 02/28/2023 | 02/27/2023 |
Bid Auth. Approval | 05/15/2023 | 04/20/2023 |
Construction Approval | 05/31/2023 | 05/23/2023 |
Project Closeout | 06/30/2024 | 08/12/2024 |
Audit Date | 08/14/2024 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 56,100 | 52,000 |
Right of Way | 0 | 0 |
Total Design | 56,100 | 52,000 |
Construction Engineering | 56,100 | 60,200 |
Construction Contract | 374,500 | 297,798 |
Other Construction | 0 | 0 |
Total Construction | 430,600 | 357,998 |
Funding Surplus | - 76,702 | |
Total TIB Funding | 409,998 | 409,998 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
GEORGE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Grind and overlay the existing roadway. Complete subgrade repair (digouts) and crack sealing where needed. E Montmorency Blvd - Washington Wy to E Deacon St
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |