City of George's FY 2020 Rehabilitation Project

2-E-858(006)-1

2-E-858(006)-1
FY 2020 Rehabilitation Project

Multiple Locations

FY 2020 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $398,492

County: Grant   |   Legislative District: 13   |   Project Length: 0.37   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date: 12/02/2019

Project Information

Lead Agency GEORGE
Funding Year 2020
Program SCPP
Current Phase Audit
Legislative District 13
Congressional District 4
Federal Route Number 13AJ
Project Length 0.37 mi.
ADT 0
Functional Class Collector
Type of Work Resurfacing
Project Contact Tina Evenson
Contact Email cityclerk@cityofgeorge.org
TIB Engineer Jonathan Heusman
Last Payment Date 12/02/2019

Project Schedule

  Target Date Actual Date
Project Selection Date   11/16/2018
Delayed Project Date 07/01/2021  
Predesign Approval
Design Approval 01/01/2019 11/29/2018
Bid Auth. Approval 05/01/2019 06/25/2019
Construction Approval 06/01/2019 07/15/2019
Project Closeout 12/31/2019 11/21/2019
Audit Date   12/02/2019
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 36,100 36,086
Right of Way 0 0
Total Design 36,100 36,086
     
Construction Engineering 54,100 54,008
Construction Contract 361,390 308,398
Other Construction 0 0
Total Construction 415,490 362,406
     
Funding Surplus - 53,098  
Total TIB Funding 398,492 398,492

Local Funding Partners

Funding Amount Percent
GEORGE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

The project provides full depth reclamation (FDR) and two-inch overlay of the approved segments.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments