TIB Project Information

City of Bridgeport's FY 2020 Overlay Project

2-E-851(005)-1

2-E-851(005)-1
FY 2020 Overlay Project

Multiple Locations

FY 2020 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $148,458

County: Douglas   |   Legislative District: 12   |   Project Length: 0.21   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 10/01/2019

Project Information

Lead Agency BRIDGEPORT
Funding Year 2020
Program SCPP
Current Phase Audit
Legislative District 12
Congressional District 4
Federal Route Number 9999
Project Length 0.21 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Stuart Dezellem
Contact Email pwsuper@nwi.net
TIB Engineer Andrew Beagle
Last Payment Date 10/01/2019

Project Schedule

  Target Date Actual Date
Project Selection Date   11/16/2018
Delayed Project Date 07/01/2021  
Predesign Approval
Design Approval 01/01/2019 01/16/2019
Bid Auth. Approval 03/01/2019 03/29/2019
Construction Approval 05/01/2019 04/25/2019
Project Closeout 12/31/2019 09/30/2019
Audit Date   10/01/2019
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 13,800 13,800
Right of Way 0 0
Total Design 13,800 13,800
     
Construction Engineering 13,800 14,004
Construction Contract 110,830 120,654
Other Construction 0 0
Total Construction 124,630 134,658
     
Funding Increase 10,028  
Total TIB Funding 148,458 148,458

Local Funding Partners

Funding Amount Percent
BRIDGEPORT 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

The project provides pavement repair and two-in overlay of the approved segments and replacement of two non-compliant sidewalk ramps.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.