The street surface is aging and shows signs of deterioration. The street provides an alternate route to Columbia Avenue (SR 173).
Projects — TIB Project Information
TIB Project Information
City of Bridgeport's FY 2020 Overlay Project
2-E-851(005)-1
2-E-851(005)-1
FY 2020 Overlay Project
Multiple Locations
FY 2020 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $148,458
County: Douglas | Legislative District: 12 | Project Length: 0.21 | TIB Engineer: Andrew Beagle | Last Payment Date: 10/01/2019
Project Information
Lead Agency | BRIDGEPORT |
Funding Year | 2020 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.21 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Stuart Dezellem |
Contact Email | pwsuper@nwi.net |
TIB Engineer | Andrew Beagle |
Last Payment Date | 10/01/2019 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/16/2018 | |
Delayed Project Date | 07/01/2021 | |
Predesign Approval | ||
Design Approval | 01/01/2019 | 01/16/2019 |
Bid Auth. Approval | 03/01/2019 | 03/29/2019 |
Construction Approval | 05/01/2019 | 04/25/2019 |
Project Closeout | 12/31/2019 | 09/30/2019 |
Audit Date | 10/01/2019 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 13,800 | 13,800 |
Right of Way | 0 | 0 |
Total Design | 13,800 | 13,800 |
Construction Engineering | 13,800 | 14,004 |
Construction Contract | 110,830 | 120,654 |
Other Construction | 0 | 0 |
Total Construction | 124,630 | 134,658 |
Funding Increase | 10,028 | |
Total TIB Funding | 148,458 | 148,458 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
BRIDGEPORT | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project provides pavement repair and two-in overlay of the approved segments and replacement of two non-compliant sidewalk ramps.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |